Completed Projects by K.M.S cpm Ltd
ESSA Primary School โ
Summer works
Ramp room: With classroom space at a premium, this useful space for at least 10 pupils was created by relocating the disabled ramp to a different location within the ever-expanding school campus.
Additional window: A simple inclusion of a full-height vision panel next to the doorway allows light and visual surveillance of this new workroom
SEN Fencing: The large open-air natural playground was created by enclosing the grass and tree area with full-height fencing to facilitate the specialist playground company to install rubberised matting and play equipment
Quiet room: Our client required a quiet space for pupils in need of some peace and calm. The large glass door keeps the sound out and the children safe.

Peel Hall Primary School, Little Hulton
Project: SEN Building, play areas and minor internal improvements
As part of a major refurbishment project at the school over the summer, we cleared away the existing fencing, excavated the yard and staged a brand-new educational play area.
Peel Hall Canopy installation
As part of the improvement works, we transformed a dated and unused storage area into a dry play space with the use of a simply designed bespoke canopy, a new scalloped fence and some non-slip GRP covers for the slippery wooden decking.

The Albion Academy, Salford
Project: Ramp to basketball court
During the summer of 2025 we carried out the excavation and construction of a very large concrete reinforced access ramp to the lower level basketball court (also the fire assembly muster point).
A truly incredible piece of superb construction and smooth concrete finish with more rebar than the foundation of the Humber bridge that Brunel himself, wouldโve been proud of.

Salford City Academy, Manchester
We were tasked with transforming a disused set of toilets that werenโt fit for purpose, and making and all-inclusive increased size space with a minimum of 15 cubicles (Including disabled).
The result was incredible, and the new external door allows for borrowed light and ease of access.
The client is delighted, and we are particularly pleased with this project.
Glass replacement
Plan and supply QC Workspace complete with Offices
From initial call out to site to discuss the project, take measurements and supply working drawings for clients to consider and approve.
Once approved a scope of works and plan were put in action to carry out works using a number of trades. Once the main area was cleared of racking in the warehouse, the A/C could be installed using a 17-metre electric scissor lift to suspend the A/C unit from the roof Purlins.
Intern the substructure of the office building could be prepared and installed leaving the way for supplementary trades to carry out their internal works, i.e. plumbing, electrics and joinery.
Armco barrier was put in place around the new QC building to complete the safety aspect already in place to allow stacker trucks to work.
Data cabling, TV Ariel supply and final decoration could then be undertaken prior to delivery of the project on time and under budget.
Hoarding Project
Our client inherited a rather shabby and unsightly site fence-line. We were tasked with the objective to smarten the entire frontage, prior to new advertising signage being installed.
Below are the photos showing the new โblank / black canvasโ
Aldi Bolton
Sweeper and plough shelter location and washroom construction at Aldi Distribution Centre, Bolton.








Crowcroft Park Primary School โ New canopy
New canopy designed and installed for Crowcroft Park Primary School in a new location, helping to keep the children dry and happy during rainy break-times.





Converted Store Room Project
A converted store room that has been spilt in stores (behind the blue concertina door) and a new uniform room installed.




Stage one WC refurbishments
Our client had been experiencing a foul odour and some floor movement in their key stage 1 WCs.
We were instructed to replace the down-to-floor cubicles with raised matching units, level off the floor and replace the vinyl flooring with matching.
What we didnโt know was the construction below the floor and the extent of the damage.
With the half term break being our window of opportunity, a herculean effort to expose, rectify and reinstate the flooring/toilets with new off -the-floor cubicles so they were useable for the hundred or so kids when they returned was completed with a few days to spare.
Regular, routine checks on pipework is essential to report leaks before they get this bad.






Chatterbox project works
Installation of artificial grass covering under existing Chatterbox dwelling.








Large scale office refurbishment project for EB Office Interiors